All · Projects

Projects

“Asarel”

Concept for protecting a concrete industrial structure against water ingress.

A task beyond sludge that shows how we approach an unusual problem in a heavy industrial setting: first understand where the water comes from, then choose a solution.

The approach

  • The structure was analysed as a whole, not just the leak points. Vertical joints every 6 metres along the full length make spot sealing pointless.
  • A full protective lining of the vaulted section was proposed, covering all the joints at once.
  • An assessment of the solution was sought from industrial protective coating specialists.

Why it matters

  • The task is not standard and has no catalogue answer. It requires understanding how the structure behaves rather than picking a product from a list.
  • It is the same approach we take with sludge: first understand what is happening, then choose the solution.

Projects

Work on real sites.

Bulgaria's largest treatment plants and heavy industry — with data measured on site.

Contact

Let's discuss the task.