Projects

Work on real sites.

Bulgaria's largest treatment plants and heavy industry — with data measured on site.

Varna WWTP

Engineering study to improve dewatering and recover the sludge.

  • Flow250 – 300 m³ digested sludge per day
  • Annual15,000 – 18,000 tonnes after dewatering
  • EquipmentOperating Alfa Laval centrifuges
Details

Plovdiv WWTP

Preliminary technology study for sludge recovery.

  • ScaleAround 20,000 tonnes of sludge a year
  • Dry solidsAround 20%
  • ContextPublished regional procedure for sludge
Details

“Asarel”

Concept for protecting a concrete industrial structure against water ingress.

  • StructureConcrete, around 130 metres long
  • ProblemWater ingress through the vertical joints
  • JointsEvery 6 metres along the full length
Details